Commercial Projects

CARTA Maintenance Facility

Description: AEC worked closely with a security contractor to install a new security system throughout the CARTA facility. This project also included installation of power for new truck lifts, new lift station, fuel tank monitor system, lighting as well as updated the fire alarm system.

Awarded: January 2010 · Completed: September 2010 · Subcontract Value: $250,000
POC: Ben Smith-Project Manager · Palmetto Contruction Group · Charleston, SC · 843-971-7156

AWC Community Center

Description: This 24,000 square foot multi-use recreation facility is a LEED (Gold) certified project. This facility consists of a 3-phase 1600-amp service with 8 panels, lighting protection system, Leviton Daylight Harvesting lighting control System, custom lighting package, HVAC power, branch circuits, and site lighting.

Awarded: June 2009 · Completed: December 2010 · Subcontract Value: $416,000
POC: Will Danielson-Project Manager · NBM Construction · Charleston, SC · 843-566-9738

Goodwill Administration Building

Description: A 28,000 sq. ft. 2 story building that serves as Goodwill's corporate office. This was a fast paced project included 1200-amp 120/208-volt service and gear, branch circuits, fire alarm system, site lighting, devices, HVAC feeders, and over 450 light fixtures.

Awarded: September 2007 · Completed: October 2008 · Subcontract Value: $450,000
POC: Daryl Campby-Project Manager · MB Kahn Construction Co., Inc. · Conway, SC · 803-736-2950

Jones Apparel Group & Stanley Upfit

Description: A 306,000 sq. ft. warehouse with 2400-amp-277/480-volt service. AEC divided the electrical for the warehouse in half for the owner and split service to accommodate two tenants and the common area. Allphase worked extensively with SCE&G, general contractor, owner, and engineer enabling a smooth service transition. AEC then up fitted 153,000 sq. ft. with a new 1300-amp- 277/480-volt service, 3 panels space for Staley power, and specialty pen and sleeve receptacles throughout the space.

Awarded: July 2008 · Completed: May 2009 · Subcontract Value: $300,000
POC: David May-Project Manager · Charles Blanchard Construction Corp. · Charleston, SC · 843-747-5757

Cintas Warehouse

Description: This 60,000 sq. ft. project consisted of 10,000 sq. ft. office and 50,000 sq. ft. warehouse. An 11 section – 2500-amp 277/480-volt custom IFS (Integrated Facility System) Cutler Hammer switch gear with over 417 lights was installed as well as site lighting. All Electrical work was completed in 8 months.

Awarded: November 2008 · Completed: August 2009 · Subcontract Value: $650,000
POC: Scott Calhoun-Project Manager · New England Construction, Inc. · Rumford, RI · 401-434-0112

Summerville, SC Airport

Description: A complete electrical and fire alarm system consisting of a 3-phase 400-amp 120/208-volt service for a 4,000 sq. ft. aviation terminal.

Awarded: September 2008 · Completed: March 2009 · Subcontract Value: $150,000
POC: Butch Clayton-Project Manager · Emory J. Infinger & Associates · Charleston, SC · 843-54-9414

Charleston Air Force Base Family Housing Phase IV

Description: AEC completed all electrical work for ten new residences which include the Wing, Group, and Squadron Commanders. Work consisted of secondary services for twelve residences (10 new and 2 existing); communication shelter and two lift stations (all related work for the Lift Stations); install underground duct banks for Bellsouth, Comcast, and base communications systems (over 60,000' of raceway); install duct bank new generator and relocated existing one; and installed (54) 30" with 36" collar concrete pole bases, pole lights, and (35) direct buried pole lights for roadways and jogging trails.

Awarded: March 2006 · Completed: May 2008 · Subcontract Value: $1,500,000
POC: Keith Klaty-Project Manager · K & K Industries · Newberry, MI · 906-293-5242

Naval Weapons Station South Annex Gate #4

Description: This was a design build project that included 100 kva transformer, 50 kva transformer, 2 manual transfer switches, 4 main panels, site lighting, high voltage feeders, gate controls, communication conduit with underground totaling over 25,000' of conduit for new pass and badge office and three guard post with canopies. All work was performed during a 3 month duration.

Awarded: June 2005 · Completed: March 2006 · Subcontract Value: $300,000
POC: Bob Nippes-Project Manager · T & G Constructors · Orlando, FL · 407-352-4443

Belk Department Store – Northwoods Mall

Description: Complete renovation of 102,000 sq. ft. retail store. AEC furnish and install all new lighting, power, fire alarm system and ninety-five floor boxes for casework. Project was split up into 11 phases. All work was completed while Belk's remained opened and fully operational. This project consisted of several difficult obstacles with AEC successfully overcoming them all.

Awarded: February 2004 · Completed: December 2004 · Subcontract Value: $400,000
POC: Doug Hint-President · Frisch & Associates Construction Co. · Charleston, SC · 843-766-2322

Park West Recreation Center

Description: Furnish and install a complete electrical package for an indoor pool and recreation facility. Provided and installed 600-amp 3-phase service and equipment watt stopper low voltage lighting control system, fire alarm system, lighted scoreboard, exterior lighting control panels and associated bunch circuits.

Awarded: February 2003 · Completed: February 2004 · Subcontract Value: $250,000
POC: Jay Mahony-Project Manager · Hill Construction Co. · Charleston, SC · 843-884-6888